Realization of the 2 future bridge’s stacks of the new Angers tram line. Vibro driving with a 25M then backpile driving 2×4 tubes 1220 mm in diameter and 14 m long with the new pneumatic hammer PAJOT 5200C.
Then, construction of the two cofferdams thanks to our PAVE 12VM and our PAJOT 5200C with its leg guide.
ANGERS PVE 25M with Air pile hammer 5200C on tubes and sheetpiles